• 2005
  • 2006
  • 2008
  • 2009
  • 2010
  • 2011
  • 2012
  • 2014
  •  

    Incorporation of Green Biofuels Sdn. Bhd.

  •  

    Construction begins on the Palm Oil Refinery (Plant 1) and Biodiesel Production Plant (Plant 2).

  •  

    Plant 1 and Plant 2 commissioned, with a production rating of 325 MT/day and 300 MT/day respectively. Production capability include RBPO and PME.

    First batch of PME produced and shipped.

  •  

    Plant 1 is upgraded to include deodorizer module. New production capability includes RBDPO.

  •  

    Construction begins on Dry Fractionation Plant (Plant 3).

    Green Biofuels Sdn. Bhd. changed its name to Green Edible Oil Sdn. Bhd. to reflect the new production capabilities.

  •  

    Plant 3 is commissioned, with a production rating of 400 MT/day. New production capability include RBDP OL and RBDP ST.

    Green Edible Oil Sdn. Bhd. became a wholly owned subsidiary of Kretam Holdings Berhad.

  •  

    Construction begins on new Palm Oil Refinery (Plant 4) and upgrade of Plant 3.

  •  

    Commissioning of Plant 4, with a production rating of 1,500 MT/day.

    Commissioning of Upgraded Plant 3, with a production rating of 1,500 MT/day.

+ -